Installation of a 500kW process chiller for Plastic extrusion manufacturer.
Leading manufacturer of building materials invests in a ZCF 2640 CF Process Chiller.
When a leading plastics extruder contacted Evolution Cooling Ltd to upgrade their existing process cooling system.
Following an assessment our team selected a ZCF CF chiller with integral pump and internal tank. System was separated via a 500kW Gasketed plate heat exchanger.
The Challenge
Plastic extrusion requires large volumes of heat to melt plastic material. The plastic is then fed through a die to form a profile. Once this profile is achieved it is cooled via a submerged bath of cold water which sets the profile and finish the product. This bath of water needs to be cooled and heat regularly removed via a Process chiller.
Water quality and temperature stability is important on Profile cooling to improve the quality of the profile.
The Solution
The plastics manufacturer turned to Evolution Cooling Ltd, a trusted expert in process chiller supply and installation. Our team selected a ZCF 2640 500kW Industrial process chiller from CF chiller. Along with this we installed a 500kW Gasketed heat exchanger to separate the process water from the chiller water.
Key Highlights Of The Solution
- CF Chiller ZCF 2640: A reliable and efficient process chiller solution, high quality components and manufacturing build.
- Turnkey Installation: Evolution Cooling’s managed decommissioning of existing plant, offload of new chiller, installation of pipework through to commissioning and load testing.
The Impact
The upgrade of the cooling system and the additional installation of intermediate heat exchanger:
- Customers Water quality: Separation of chiller circuit and customer process water ensures ease of water treatment and reduces the risk of cross contamination.
- Reliability: The plastics company experienced enhanced reliability with minimal downtime, preserving the integrity of their operations.
Conclusion
Assessment of the customers previous experience along with their needs for reliable cooling system allowed Evolution Cooling Ltd to provide a tailored solution. The CF chiller will provide reliable cooling and extended equipment life.
Planned maintenance by Evolution cooling Ltd will ensure that the equipment performance is optimised and its life time is extended.
”The Chiller is maintaining our temperatures well. We can now run our production at full capacity again, Thanks.
Production Manager