Case Study

Delivering High-Performance Process Cooling for Induction Welding in North Carolina

The Challenge

The Solution

Key Highlights Of The Solution

480V /50Hz 180kW Chiller Supplied by Evolution Cooling Ltd
Dual pump system to maintain 8 bar pressure
Plate heat exchanger for efficient heat transfer
Fan speed control for optimised energy usage
Soft start contactors to reduce electrical surges
500-litre buffer tank for system stability
R410a refrigerant for high efficiency and compliance with regulations

Our team travelled to North Carolina to carry out the installation and commissioning, ensuring a seamless and timely execution.

Project Outcome

The Results

💡 Delivered ahead of schedule – completed within six weeks from order
⚙️ System performed exactly as required, meeting both OEM and end-customer expectations
🌍 Energy-efficient design reduced operational costs while ensuring compliance
🔧 Flawless installation process with no disruption to operations

The client was highly impressed with the fast delivery, system performance, and our engineers’ technical expertise on-site. The project was completed on time and exceeded expectations, reinforcing Evolution Cooling Ltd’s reputation for reliability and innovation in industrial process cooling.